Process Analysis of RP1
Productivity and Financial Bottlenecks
Short-Term Analysis
Long-Term Analysis
Conclusion
Productivity Bottleneck 1: Drying Process2: Quality Grading & Drying for Bulks3: Inefficient Positioning of Process
Financial BottleneckWorkforce
Bottleneck at Drying procedure
Overtime Costs & Truck Queue
To solve the problem,
Minimizing the Cost
Remove Truck Queue
Amount of berries
: 75 X 243 = 18225
But, we assumed it is 19000 for easiness of the calculation
Total work time except overtime
: 12 – 1 (for lunch) = 11hrs.
Total amount of wet berries per hour
: (19000 X 0.7) / 11 = 1210